Please answer the following questions so that Alar can help determine the best AutoVac® suited for your concrete process and match it with a budgetary estimate.
1.) Has your company worked with Alar?
Yes No
2.) Concrete Industry Type : (ex. Ready Mixed, Precast, Hydro-demolition, Block, Core Drilling)
3.) Does your company separate rock, aggregate and/or sand?
Yes No
If YES, Do you use a reclaimer or another type of device for this process??
Yes No
4.) Where is the concrete process slurry generated?
Pouring buckets
Transporter
Tool clean up
Mixer
Yard Water
Reclaimer
5.) Do you have Mixer Trucks?
Yes No
If YES, how many trucks?
If YES, how many washouts?
6.) What are the average US gallons of process slurry produced per day?
a. Peak conditions
b. Future growth / maximum volume?
7.) What is the Specific Gravity of the process slurry?
a. What percent solid content by weight is the slurry water?
b. TSS in ppm (mg/l)
8.) How many days does the company operate?
a. How many hours per day?
b. How many shifts per day?
c. How many hours per shift?
9.) Does the company use Iron Oxide Pigments?
Yes No
10.) Does the company use fibers in the process?
Yes No
11.) What is your company's goal:
Reduce specific gravity
Filter 100% of the slurry water
12.) Does the company have a settling pond?
Yes No
a. What are the dimensions of the pond?
b. Can the pond be segmented or cordoned off?
Yes No
c. If yes, can mixing be provided to keep solids in suspension?
Yes No
13.) How many times is the pond dredged?
14.) Is the wet sludge hauled away?
Yes No
a. If YES , how many times is the sludge hauled?
b. If YES , how much does it cost for hauling?
15.) Is the wet sludge put into a drying bed?
Yes No
16.) Is pH an issue?
Yes No
17.) Utilities
a. What is your electricity?
3-Phase 460V Electricity
3-Phase 575V
3-Phase 230V
1-Phase 115V electricity
b. Plant air?
Yes No
i.If YES, then what CFM?
c. City Water or Well Water?
City Well
i. Water pressure?
ii. Can it handle up 50-100 gpm?
Yes No
18.) Pumps
a. Are there pumps to deliver gray water to the Alar Filter?
Yes No
b. Are there pumps to deliver clean water back to the operation?
Yes No
19. The Alar AutoVac® is not designed for outdoor use. Does the company have a building to keep the machine out of the elements?
Yes No
20. What is the current timeframe to install a water recycling system?
A.S.A.P
3 - 6 Months
6 months - 1 yr
Greater than 1 year
21. Is a budget allocated for this project?
Yes No
22. Is there interest in a lease-to-own program?
Yes No